Duke: Oconee didn't do everything to prevent leak - FOX Carolina 21

Duke: Oconee didn't do everything to prevent leak

Posted: Updated:
Oconee Nuclear Station is located on Lake Keowee near Seneca. (File/FOX Carolina) Oconee Nuclear Station is located on Lake Keowee near Seneca. (File/FOX Carolina)
SENECA, SC (AP) -

Duke Energy officials say site operators didn't take all possible precautions to prevent a radioactive water leak that led to shutdown of a South Carolina nuclear reactor.

The comments came during a U.S. Nuclear Regulatory Commission meeting in Atlanta on Thursday. Engineers and regulators examined the development of a crack in a high-pressure injector line that led to a leak that forced the shutdown at the Oconee Nuclear Station last November.

The shutdown came after engineers detected flaws in the airtight, steel-lined concrete containment building designed to prevent radiation from leaking into the air or ground.

Officials said there was no threat to employees or the public, and the crack was quickly repaired. Regulators made no decisions public Thursday about the safety significance of the leak.

Copyright 2014 The Associated Press. All rights reserved.

Powered by WorldNow
Fox Carolina
Powered by WorldNow CNN
All content © 2014, WHNS; Greenville, SC. (A Meredith Corporation Station) and WorldNow. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.